Campus profile Operating
Citadel Campus
Switch · Tahoe Reno Industrial Center, Nevada
The resource footprint
Modelled averageIn one day, this campus consumes about
1.7750-metre swimming pools
Filled with the volume of water consumed by the campus and its electricity supply.
The actual estimate1,171,833 US gallons consumed
Power-plant water may come from a different watershed. This is a volume comparison, not a claim that households lose this water.
At current operating capacity · Annual model spread evenly over time, not a live meter. Site estimates may differ by roughly ±40%.
Comparison sizes & sources
One pool = 50 × 25 × 2 metres = 2.5 million litres (about 660,430 US gallons). Pool depths vary; this is a defined comparison size.
One home-year = 10,791 kWh, the EIA’s 2022 average US residential electricity purchases. This excludes electricity generated at home and is a fixed US benchmark for all sites.
One car-year = 4.6 tonnes CO₂, the EPA’s typical passenger vehicle tailpipe estimate. The campus model is in CO₂e; the comparison expresses approximate climate scale, not equal mixtures of pollutants.
Monthly values are annual totals ÷ 12; daily values are annual totals ÷ 365. Actual demand varies. Comparisons cover the whole campus, including non-AI uses.
Water: see the numbers and sources
This is water used up, mainly through evaporation. Power-generation water may be used in a different watershed.
- Pressure on local water
- Extremely High — a regional measure of demand compared with available water
- Where the water comes from
- Closed loop — negligible draw
- Cooling
- Switch's own waterless hybrid design
- Basis
- Fitted to a published figure of 18.0 million gallons a year
Air: see the numbers and sources
The totals include nitrogen oxides, sulphur dioxide and fine particles. They cover both this site and the power plants supplying it.
- Health range
- $17.1–48.4 million a year. Lower bound is EASIUR national mid-range; upper is EPA benefit-per-ton at a ~$12M VSL.
- Statistical deaths
- 4.03 a year at that VSL — a national-average conversion from tons, not a local concentration study.
- Equals
- 511,255 cars of NOx
- Where it burns
- WECC Rockies — Utah / Nevada
- Generation mix
- Gas 42 · Coal 34 · Solar 12 · Geo 5
- Diesel backup
- Diesel backup is not yet counted for this campus, so on-site air figures are a floor.
- CO₂e
- 652 kt/yr — climate, not air quality
The project, approvals and community concerns
- Who asked for it
- Mixed colocation tenants — no single anchor disclosed
- Who approved it
- Storey County TRIC master plan; NV Energy green-tariff supply from dedicated solar
- What it serves
- Colocation for enterprise, government and AI tenants
- IT capacity
- 200 MW current capacity / 650 MW full-build scenario
Marketed as the largest colocation campus in the world and built essentially waterless in the high desert, on a dedicated solar tariff. A useful upper bound on how low a big site's water and carbon can go when siting is deliberate.
Keep this guide handy
39.5300°, -119.4400°
Quote or share these estimates
Gigawatt Ledger (2026). Citadel Campus: water and air. https://gigawatt-ledger.pages.dev/site/citadel/. Modelled from disclosed capacity; site-level error ±40%.
Include the estimate’s date, whether it describes current or proposed capacity, and its uncertainty. Get an embeddable card.
Gigawatt Ledger · September 2026. Water and air figures are estimated from public records and disclosed capacity. How we calculate them · Use this in your community.