Central Ohio cluster

AWS · Google · Meta · Microsoft · New Albany / Hilliard / Dublin, Ohio

Water — consumed, not returned

Taken from the basin2,822M gal/yr
Evaporated on site760M gal
Making the power2,062M gal
Basin stressLow-Medium
Where the water comes from
Municipal potable supply
Cooling
Mixed evaporative and closed-loop
Basis
Fitted to a published figure of 760 million gallons a year

Air — what the stacks emit

Nitrogen oxides989t/yr
Sulphur dioxide1,717t/yr
Fine particulates156t PM2.5
Health damages$166M/yr
Where it burns
PJM RFC — Ohio / Penn.
Generation mix
Gas 48 · Nuclear 27 · Coal 20
CO₂e
2,029 kt/yr — climate, not air quality

Who wanted it

Who asked for it
All four major hyperscalers, each with its own campus
Who approved it
New Albany's pre-zoned business park; AEP Ohio's contested data center tariff, approved by PUCO in 2025, requires large loads to pay for 85% of subscribed capacity whether or not they use it
What it serves
AWS us-east-2, Google and Microsoft cloud regions, Meta app serving
IT capacity
900 MW running of 2,500 MW announced

The AEP Ohio case is the most-cited regulatory precedent in the US: it established that data centers must post minimum-demand commitments so that other ratepayers aren't left holding the bill for capacity that never materialises.

ratepayer-cost dispute

Where it is

40.0500°, -82.9500°

Water and air figures are modelled from disclosed capacity, not measured — site-level error is roughly ±40%. Diesel backup generators are not counted, so on-site figures are floors. Full method.