The resource footprint
Modelled averageIn one day, this campus would consume about
11.950-metre swimming pools
Filled with the volume of water consumed by the campus and its electricity supply.
The actual estimate7,876,723 US gallons consumed
Power-plant water may come from a different watershed. This is a volume comparison, not a claim that households lose this water.
If announced plans are fully built · Not operating yet · Annual model spread evenly over time, not a live meter. Site estimates may differ by roughly ±40%.
Comparison sizes & sources
One pool = 50 × 25 × 2 metres = 2.5 million litres (about 660,430 US gallons). Pool depths vary; this is a defined comparison size.
One home-year = 10,791 kWh, the EIA’s 2022 average US residential electricity purchases. This excludes electricity generated at home and is a fixed US benchmark for all sites.
One car-year = 4.6 tonnes CO₂, the EPA’s typical passenger vehicle tailpipe estimate. The campus model is in CO₂e; the comparison expresses approximate climate scale, not equal mixtures of pollutants.
Monthly values are annual totals ÷ 12; daily values are annual totals ÷ 365. Actual demand varies. Comparisons cover the whole campus, including non-AI uses.
Water: see the numbers and sources
This is water used up, mainly through evaporation. Power-generation water may be used in a different watershed.
- Pressure on local water
- Extremely High — a regional measure of demand compared with available water
- Where the water comes from
- Closed loop — negligible draw
- Cooling
- Air-cooled closed loop, chosen for the desert siting
- Basis
- Modelled from cooling design — WUE 0.06 L/kWh
- Claimed vs observed
- Claimed 0.17 million gallons a year; observed or registered 103 million.
Air: see the numbers and sources
The totals include nitrogen oxides, sulphur dioxide and fine particles. They cover both this site and the power plants supplying it.
- Health range
- $45.6–131 million a year. Lower bound is EASIUR national mid-range; upper is EPA benefit-per-ton at a ~$12M VSL.
- Statistical deaths
- 10.9 a year at that VSL — a national-average conversion from tons, not a local concentration study.
- Equals
- 1,619,505 cars of NOx
- Where it burns
- WECC Southwest — Ariz. / N.M.
- Generation mix
- Gas 46 · Nuclear 22 · Solar 14 · Coal 12
- Diesel backup
- On-site power is 2,275 Bloom fuel cells, not diesel. Draft NSR 10883 (29 July 2026) would cap 37.2 t/yr NOx, 0.1 t/yr SO2 and 75.4 t/yr PM2.5.
- Air permit
- 37.2 t/yr NOx enforced cap · 0.10 t/yr SO₂ · 75.4 t/yr PM2.5 — 62.8 tons under the 100-ton Title V major-source line
- CO₂e
- 3,213 kt/yr — climate, not air quality
The project, approvals and community concerns
- Who asked for it
- OpenAI — via Oracle; Project Jupiter developed with Borderplex
- Who approved it
- Doña Ana County approved up to $165 billion of taxable industrial revenue bonds (a conduit for property-tax abatements; developer stated $360 million PILOT); El Paso Electric supply; New Mexico groundwater permitting under the State Engineer
- Tax deal
- Doña Ana County approved up to $165 billion of taxable industrial revenue bonds as a conduit for property-tax abatements and equipment gross-receipts-tax deductions. The developer stated $360 million in payments in lieu of taxes.
- What it serves
- OpenAI compute under Stargate
- IT capacity
- 0 MW current capacity / 1,000 MW full-build scenario
Sited in the Mesilla basin, where groundwater is adjudicated and contested across the Texas–New Mexico line. The design is air-cooled specifically because water rights here are effectively unavailable.
Keep this guide handy
32.0300°, -106.6500°
Quote or share these estimates
Gigawatt Ledger (2026). Doña Ana County: water and air. https://gigawatt-ledger.pages.dev/site/donaana/. Modelled from disclosed capacity; site-level error ±40%.
Include the estimate’s date, whether it describes current or proposed capacity, and its uncertainty. Get an embeddable card.
Gigawatt Ledger · September 2026. Water and air figures are estimated from public records and disclosed capacity. How we calculate them · Use this in your community.