Campus profile Operating

Grange Castle / Dublin West

Microsoft · Clondalkin, Dublin, Leinster, Ireland

The resource footprint

Modelled average

In one day, this campus consumes about

1.6550-metre swimming pools

Filled with the volume of water consumed by the campus and its electricity supply.

The actual estimate1,090,439 US gallons consumed

50-metre pools · 2 metres deep
Each diagram = 1 pool. Partial shading shows the remainder.
At the campus389,442 galMaking its electricity700,996 gal

Power-plant water may come from a different watershed. This is a volume comparison, not a claim that households lose this water.

At current operating capacity · Annual model spread evenly over time, not a live meter. Site estimates may differ by roughly ±40%.

Comparison sizes & sources

One pool = 50 × 25 × 2 metres = 2.5 million litres (about 660,430 US gallons). Pool depths vary; this is a defined comparison size.

One home-year = 10,791 kWh, the EIA’s 2022 average US residential electricity purchases. This excludes electricity generated at home and is a fixed US benchmark for all sites.

One car-year = 4.6 tonnes CO₂, the EPA’s typical passenger vehicle tailpipe estimate. The campus model is in CO₂e; the comparison expresses approximate climate scale, not equal mixtures of pollutants.

Monthly values are annual totals ÷ 12; daily values are annual totals ÷ 365. Actual demand varies. Comparisons cover the whole campus, including non-AI uses.

Water: see the numbers and sources

This is water used up, mainly through evaporation. Power-generation water may be used in a different watershed.

Total water use398M gal/yr
Evaporated on site142M gal
Making the power256M gal
Household comparison4,975homes, at 80,000 gal/year
Pressure on local water
Low — a regional measure of demand compared with available water
Where the water comes from
Municipal potable supply
Cooling
Free-air cooling almost year-round; evaporative on rare warm days
Basis
Modelled from cooling design — WUE 0.25 L/kWh
Air: see the numbers and sources

The totals include nitrogen oxides, sulphur dioxide and fine particles. They cover both this site and the power plants supplying it.

Nitrogen oxides237t/yr
Sulphur dioxide129t/yr
Fine particulates21.5t PM2.5
Health (EPA)$19.5M/yr
Health range
$6.91–19.5 million a year. Lower bound is EASIUR national mid-range; upper is EPA benefit-per-ton at a ~$12M VSL.
Statistical deaths
1.63 a year at that VSL — a national-average conversion from tons, not a local concentration study.
Equals
295,946 cars of NOx
Where it burns
Ireland — EirGrid
Generation mix
Gas 47 · Wind 34 · Coal 3
Diesel backup
Diesel backup is not yet counted for this campus, so on-site air figures are a floor.
CO₂e
641 kt/yr — climate, not air quality
The project, approvals and community concerns
Who asked for it
Microsoft — self-build and Azure customers, including EU data-residency workloads
Who approved it
South Dublin County Council planning; EirGrid connection agreements — new Dublin-area connections are effectively frozen until 2028
What it serves
Azure North Europe — the default European region for much of the world's SaaS
IT capacity
300 MW current capacity / 450 MW full-build scenario

Irish data centers passed 21% of national electricity consumption in 2023 and kept climbing — more than all urban households combined. EirGrid's de facto Dublin moratorium is the strongest grid-side brake any country has applied.

under a growth moratoriumratepayer-cost dispute

Keep this guide handy

53.3130°, -6.4200°

Quote or share these estimates

Gigawatt Ledger (2026). Grange Castle / Dublin West: water and air. https://gigawatt-ledger.pages.dev/site/grangecastle/. Modelled from disclosed capacity; site-level error ±40%.

Include the estimate’s date, whether it describes current or proposed capacity, and its uncertainty. Get an embeddable card.

Gigawatt Ledger · September 2026. Water and air figures are estimated from public records and disclosed capacity. How we calculate them · Use this in your community.