Homer City Redevelopment / Knighthead · Homer City, Pennsylvania
Not built yet. Every figure below is what it would take and emit at the capacity its owners have announced.
Water — consumed, not returned
Taken from the basin3,671M gal/yr
Evaporated on site1,405M gal
Making the power2,266M gal
Basin stressLow
Where the water comes from
Municipal potable supply
Cooling
Closed-loop liquid (as proposed)
Basis
Modelled from cooling design — WUE 0.19 L/kWh
Air — what the stacks emit
Nitrogen oxides12,867t/yr
Sulphur dioxide85.8t/yr
Fine particulates858t PM2.5
Health damages$596M/yr
Where it burns
Behind-the-meter gas turbines + 100% turbines on the site itself
Generation mix
On-site simple/combined-cycle gas, ~100%
Emitted at the fence line
100% of this site's criteria pollution
CO₂e
13,296 kt/yr — climate, not air quality
Who wanted it
Who asked for it
No tenant disclosed; developers cite unnamed hyperclouds
Who approved it
Pennsylvania DEP air permits for seven GE Vernova turbines totalling ~4.5 GW; Indiana County local approvals; sited on an existing but retired transmission interconnection
What it serves
Speculative AI campus — tenants not announced
IT capacity
0 MW running of 3,200 MW announced
Pennsylvania's largest coal plant, demolished in 2023, being replaced by what would be one of the largest gas plants ever built in the US — for a data center campus with no named customer. The clearest instance of speculative gas buildout on AI expectations.
Water and air figures are modelled from disclosed capacity, not measured — site-level
error is roughly ±40%. Diesel backup generators are not counted, so on-site figures are floors.
Full method.