City of Kuna annexation; Idaho Power supply, with a new large-load tariff approved by the Idaho PUC in 2024 that requires 80% minimum demand charges
What it serves
Meta app serving and inference
IT capacity
80 MW running of 300 MW announced
Idaho Power's tariff was one of the first in the country to require minimum demand charges from data centers, after the utility warned that a single campus could equal a fifth of its peak load.
Water and air figures are modelled from disclosed capacity, not measured — site-level
error is roughly ±40%. Diesel backup generators are not counted, so on-site figures are floors.
Full method.