Gigawatt Ledger · one-page briefing
Campus profile Operating
Midlothian / Red Oak
Google · Meta · Ellis County developers · Midlothian, Texas
The resource footprint
Modelled averageIn one day, this campus consumes about
2.1750-metre swimming pools
Filled with the volume of water consumed by the campus and its electricity supply.
The actual estimate1,432,820 US gallons consumed
Power-plant water may come from a different watershed. This is a volume comparison, not a claim that households lose this water.
At current operating capacity · Annual model spread evenly over time, not a live meter. Site estimates may differ by roughly ±40%.
Comparison sizes & sources
One pool = 50 × 25 × 2 metres = 2.5 million litres (about 660,430 US gallons). Pool depths vary; this is a defined comparison size.
One home-year = 10,791 kWh, the EIA’s 2022 average US residential electricity purchases. This excludes electricity generated at home and is a fixed US benchmark for all sites.
One car-year = 4.6 tonnes CO₂, the EPA’s typical passenger vehicle tailpipe estimate. The campus model is in CO₂e; the comparison expresses approximate climate scale, not equal mixtures of pollutants.
Monthly values are annual totals ÷ 12; daily values are annual totals ÷ 365. Actual demand varies. Comparisons cover the whole campus, including non-AI uses.
Water: see the numbers and sources
This is water used up, mainly through evaporation. Power-generation water may be used in a different watershed.
- Pressure on local water
- High — a regional measure of demand compared with available water
- Where the water comes from
- Reclaimed / recycled water
- Cooling
- Mixed; reclaimed water where available
- Basis
- Modelled from cooling design — WUE 0.34 L/kWh
- Claimed vs observed
- Google Midlothian consumed 220.2 million gallons in 2025. Meta's Ellis County figure is not in Google's table; this cluster row remains modelled.
Air: see the numbers and sources
The totals include nitrogen oxides, sulphur dioxide and fine particles. They cover both this site and the power plants supplying it.
- Health range
- $11.1–32.3 million a year. Lower bound is EASIUR national mid-range; upper is EPA benefit-per-ton at a ~$12M VSL.
- Statistical deaths
- 2.69 a year at that VSL — a national-average conversion from tons, not a local concentration study.
- Equals
- 290,887 cars of NOx
- Where it burns
- ERCOT — Texas
- Generation mix
- Gas 40 · Wind 24 · Solar 11 · Coal 13 · Nuclear 9
- Diesel backup
- Diesel backup is not yet counted for this campus, so on-site air figures are a floor.
- CO₂e
- 585 kt/yr — climate, not air quality
The project, approvals and community concerns
- Who asked for it
- Google and Meta, each with separate campuses in Ellis County
- Who approved it
- Ellis County and City of Midlothian abatements; ERCOT interconnection; Texas SB6 curtailment rules now apply to loads over 75 MW
- What it serves
- Google Cloud us-south1 and Meta app serving
- IT capacity
- 300 MW current capacity / 900 MW full-build scenario
Texas SB6, passed in 2025, is the first US law letting a grid operator order data centers to disconnect during emergencies — a direct response to the winter-storm risk that ERCOT loads now represent.
Keep this guide handy
32.4820°, -96.9942°
Quote or share these estimates
Gigawatt Ledger (2026). Midlothian / Red Oak: water and air. https://gigawatt-ledger.pages.dev/site/midlothian/. Modelled from disclosed capacity; site-level error ±40%.
Include the estimate’s date, whether it describes current or proposed capacity, and its uncertainty. Get an embeddable card.
Gigawatt Ledger · September 2026. Water and air figures are estimated from public records and disclosed capacity. How we calculate them · Use this in your community.