Prometheus

Meta Platforms · New Albany, Ohio

Water — consumed, not returned

Taken from the basin941M gal/yr
Evaporated on site162M gal
Making the power779M gal
Basin stressLow
Where the water comes from
Municipal potable supply
Cooling
Closed-loop liquid with air economization
Basis
Modelled from cooling design — WUE 0.25 L/kWh

Air — what the stacks emit

Nitrogen oxides627t/yr
Sulphur dioxide610t/yr
Fine particulates73.7t PM2.5
Health damages$71.5M/yr
Where it burns
PJM RFC — Ohio / Penn. + 25% turbines on the site itself
Generation mix
Gas 48 · Nuclear 27 · Coal 20
Emitted at the fence line
23% of this site's criteria pollution
CO₂e
1,004 kt/yr — climate, not air quality

Who wanted it

Who asked for it
Meta — self-build
Who approved it
City of New Albany / Licking County JEDZ agreements; AEP Ohio data center tariff approved by PUCO in 2025 after a contested case
What it serves
Meta's first multi-gigawatt AI training cluster
IT capacity
300 MW running of 1,000 MW announced

Meta trucked in on-site gas generation to beat the interconnection queue. The PUCO tariff fight here set the national precedent that large loads must post collateral for the capacity they reserve.

on-site gas turbinesratepayer-cost dispute

Where it is

40.0812°, -82.8088°

Water and air figures are modelled from disclosed capacity, not measured — site-level error is roughly ±40%. Diesel backup generators are not counted, so on-site figures are floors. Full method.