The resource footprint

Modelled average

In one day, this campus consumes about

3.950-metre swimming pools

Filled with the volume of water consumed by the campus and its electricity supply.

The actual estimate2,578,689 US gallons consumed

50-metre pools · 2 metres deep
Each diagram = 1 pool. Partial shading shows the remainder.
At the campus444,602 galMaking its electricity2,134,088 gal

Power-plant water may come from a different watershed. This is a volume comparison, not a claim that households lose this water.

At current operating capacity · Annual model spread evenly over time, not a live meter. Site estimates may differ by roughly ±40%.

Comparison sizes & sources

One pool = 50 × 25 × 2 metres = 2.5 million litres (about 660,430 US gallons). Pool depths vary; this is a defined comparison size.

One home-year = 10,791 kWh, the EIA’s 2022 average US residential electricity purchases. This excludes electricity generated at home and is a fixed US benchmark for all sites.

One car-year = 4.6 tonnes CO₂, the EPA’s typical passenger vehicle tailpipe estimate. The campus model is in CO₂e; the comparison expresses approximate climate scale, not equal mixtures of pollutants.

Monthly values are annual totals ÷ 12; daily values are annual totals ÷ 365. Actual demand varies. Comparisons cover the whole campus, including non-AI uses.

Water: see the numbers and sources

This is water used up, mainly through evaporation. Power-generation water may be used in a different watershed.

Total water use941M gal/yr
Evaporated on site162M gal
Making the power779M gal
Household comparison11,765homes, at 80,000 gal/year
Pressure on local water
Low — a regional measure of demand compared with available water
Where the water comes from
Municipal potable supply
Cooling
Closed-loop liquid with air economization
Basis
Modelled from cooling design — WUE 0.25 L/kWh
Air: see the numbers and sources

The totals include nitrogen oxides, sulphur dioxide and fine particles. They cover both this site and the power plants supplying it.

Nitrogen oxides627t/yr
Sulphur dioxide610t/yr
Fine particulates73.7t PM2.5
Health (EPA)$71.5M/yr
Health range
$25.2–71.5 million a year. Lower bound is EASIUR national mid-range; upper is EPA benefit-per-ton at a ~$12M VSL.
Statistical deaths
5.96 a year at that VSL — a national-average conversion from tons, not a local concentration study.
Equals
783,226 cars of NOx
Where it burns
PJM RFC — Ohio / Penn. + 25% turbines on the site itself
Generation mix
Gas 48 · Nuclear 27 · Coal 20
Emitted at the fence line
23% of this site's criteria pollution
Diesel backup
Williams 'Socrates' off-grid gas: 238.6 tpy NOx per plant, permitted to Will-Power OH, not to Meta. Original diesel black-start units were partly replaced with batteries.
Air permit
239 t/yr NOx potential-to-emit
CO₂e
1,004 kt/yr — climate, not air quality
The project, approvals and community concerns
Who asked for it
Meta — self-build
Who approved it
City of New Albany / Licking County JEDZ agreements; AEP Ohio data center tariff approved by PUCO in 2025 after a contested case
What it serves
Meta's first multi-gigawatt AI training cluster
IT capacity
300 MW current capacity / 1,000 MW full-build scenario

Meta trucked in on-site gas generation to beat the interconnection queue. The PUCO tariff fight here set the national precedent that large loads must post collateral for the capacity they reserve.

on-site gas turbinesratepayer-cost dispute

Keep this guide handy

40.0812°, -82.8088°

Quote or share these estimates

Gigawatt Ledger (2026). Prometheus: water and air. https://gigawatt-ledger.pages.dev/site/prometheus/. Modelled from disclosed capacity; site-level error ±40%.

Include the estimate’s date, whether it describes current or proposed capacity, and its uncertainty. Get an embeddable card.

Gigawatt Ledger · September 2026. Water and air figures are estimated from public records and disclosed capacity. How we calculate them · Use this in your community.