Campus profile Operating

Beauharnois

Bitfarms / Hydro-Québec industrial park · Beauharnois, Québec, Canada

The resource footprint

Modelled average

In one day, this campus consumes about

3.650-metre swimming pools

Filled with the volume of water consumed by the campus and its electricity supply.

The actual estimate2,379,831 US gallons consumed

50-metre pools · 2 metres deep
Each diagram = 1 pool. Partial shading shows the remainder.
At the campus74,370 galMaking its electricity2,305,461 gal

Power-plant water may come from a different watershed. This is a volume comparison, not a claim that households lose this water.

At current operating capacity · Annual model spread evenly over time, not a live meter. Site estimates may differ by roughly ±40%.

Comparison sizes & sources

One pool = 50 × 25 × 2 metres = 2.5 million litres (about 660,430 US gallons). Pool depths vary; this is a defined comparison size.

One home-year = 10,791 kWh, the EIA’s 2022 average US residential electricity purchases. This excludes electricity generated at home and is a fixed US benchmark for all sites.

One car-year = 4.6 tonnes CO₂, the EPA’s typical passenger vehicle tailpipe estimate. The campus model is in CO₂e; the comparison expresses approximate climate scale, not equal mixtures of pollutants.

Monthly values are annual totals ÷ 12; daily values are annual totals ÷ 365. Actual demand varies. Comparisons cover the whole campus, including non-AI uses.

Water: see the numbers and sources

This is water used up, mainly through evaporation. Power-generation water may be used in a different watershed.

Total water use869M gal/yr
Evaporated on site27.1M gal
Making the power841M gal
Household comparison10,858homes, at 80,000 gal/year
Pressure on local water
Low — a regional measure of demand compared with available water
Where the water comes from
Closed loop — negligible draw
Cooling
Free cooling most of the year on hydro power
Basis
Modelled from cooling design — WUE 0.10 L/kWh
Air: see the numbers and sources

The totals include nitrogen oxides, sulphur dioxide and fine particles. They cover both this site and the power plants supplying it.

Nitrogen oxides10.3t/yr
Sulphur dioxide4.11t/yr
Fine particulates1.03t PM2.5
Health (EPA)$0.81M/yr
Health range
$0.28–0.81 million a year. Lower bound is EASIUR national mid-range; upper is EPA benefit-per-ton at a ~$12M VSL.
Statistical deaths
0.07 a year at that VSL — a national-average conversion from tons, not a local concentration study.
Equals
12,844 cars of NOx
Where it burns
Norway — Statnett
Generation mix
Hydro 88 · Wind 10
Diesel backup
Diesel backup is not yet counted for this campus, so on-site air figures are a floor.
CO₂e
29.8 kt/yr — climate, not air quality
The project, approvals and community concerns
Who asked for it
Mixed hosting customers; several Québec sites have been re-leased from bitcoin miners to AI operators
Who approved it
Hydro-Québec paused new large-load connections in 2023 and now allocates blocks selectively, explicitly deprioritising crypto in favour of AI and industry
What it serves
Compute hosting converting from crypto mining to AI training
IT capacity
120 MW current capacity / 250 MW full-build scenario

Québec is the clearest case of a utility rationing cheap clean power between competing digital uses. The crypto-to-AI conversion happening here is repeating across Texas and the Nordics.

under a growth moratoriumconverted from crypto mining

Keep this guide handy

45.3150°, -73.8720°

Quote or share these estimates

Gigawatt Ledger (2026). Beauharnois: water and air. https://gigawatt-ledger.pages.dev/site/quebec/. Modelled from disclosed capacity; site-level error ±40%.

Include the estimate’s date, whether it describes current or proposed capacity, and its uncertainty. Get an embeddable card.

Gigawatt Ledger · September 2026. Water and air figures are estimated from public records and disclosed capacity. How we calculate them · Use this in your community.