Gigawatt Ledger · one-page briefing
Campus profile Operating
West San Antonio campus
Microsoft · San Antonio, Texas
The resource footprint
Modelled averageIn one day, this campus consumes about
4.0150-metre swimming pools
Filled with the volume of water consumed by the campus and its electricity supply.
The actual estimate2,650,419 US gallons consumed
Power-plant water may come from a different watershed. This is a volume comparison, not a claim that households lose this water.
At current operating capacity · Annual model spread evenly over time, not a live meter. Site estimates may differ by roughly ±40%.
Comparison sizes & sources
One pool = 50 × 25 × 2 metres = 2.5 million litres (about 660,430 US gallons). Pool depths vary; this is a defined comparison size.
One home-year = 10,791 kWh, the EIA’s 2022 average US residential electricity purchases. This excludes electricity generated at home and is a fixed US benchmark for all sites.
One car-year = 4.6 tonnes CO₂, the EPA’s typical passenger vehicle tailpipe estimate. The campus model is in CO₂e; the comparison expresses approximate climate scale, not equal mixtures of pollutants.
Monthly values are annual totals ÷ 12; daily values are annual totals ÷ 365. Actual demand varies. Comparisons cover the whole campus, including non-AI uses.
Water: see the numbers and sources
This is water used up, mainly through evaporation. Power-generation water may be used in a different watershed.
- Pressure on local water
- Extremely High — a regional measure of demand compared with available water
- Where the water comes from
- Reclaimed / recycled water
- Cooling
- Evaporative towers on SAWS recycled water
- Basis
- Fitted to a published figure of 480 million gallons a year
Air: see the numbers and sources
The totals include nitrogen oxides, sulphur dioxide and fine particles. They cover both this site and the power plants supplying it.
- Health range
- $14.5–42.2 million a year. Lower bound is EASIUR national mid-range; upper is EPA benefit-per-ton at a ~$12M VSL.
- Statistical deaths
- 3.52 a year at that VSL — a national-average conversion from tons, not a local concentration study.
- Equals
- 379,877 cars of NOx
- Where it burns
- ERCOT — Texas
- Generation mix
- Gas 40 · Wind 24 · Solar 11 · Coal 13 · Nuclear 9
- Diesel backup
- This campus is Microsoft on SAWS reclaimed water. A separate Vantage/VoltaGrid San Antonio fight (151 gensets, ~5,600 t NOx) is not this site and is not mixed in.
- CO₂e
- 764 kt/yr — climate, not air quality
The project, approvals and community concerns
- Who asked for it
- Microsoft — self-build and Azure customers
- Who approved it
- City of San Antonio + Bexar County incentives; San Antonio Water System recycled-water contract
- What it serves
- Azure south-central US region
- IT capacity
- 300 MW current capacity / 600 MW full-build scenario
Runs largely on SAWS reclaimed water rather than potable supply, which is the mitigation most often proposed elsewhere. Even so, in a city under recurring Stage 3 drought restrictions the volumes remain politically contested.
Keep this guide handy
29.4241°, -98.7200°
Quote or share these estimates
Gigawatt Ledger (2026). West San Antonio campus: water and air. https://gigawatt-ledger.pages.dev/site/sanantonio/. Modelled from disclosed capacity; site-level error ±40%.
Include the estimate’s date, whether it describes current or proposed capacity, and its uncertainty. Get an embeddable card.
Gigawatt Ledger · September 2026. Water and air figures are estimated from public records and disclosed capacity. How we calculate them · Use this in your community.