Meta Platforms · Social Circle / Newton County, Georgia
Water — consumed, not returned
Taken from the basin1,309M gal/yr
Evaporated on site133M gal
Making the power1,176M gal
Basin stressMedium-High
Where the water comes from
Groundwater — aquifer withdrawal
Cooling
Indirect evaporative + closed-loop retrofit
Basis
Modelled from cooling design — WUE 0.19 L/kWh
Air — what the stacks emit
Nitrogen oxides351t/yr
Sulphur dioxide594t/yr
Fine particulates56.7t PM2.5
Health damages$58.6M/yr
Where it burns
Southern Co. — Georgia / Alabama
Generation mix
Gas 48 · Nuclear 28 · Coal 15
CO₂e
890 kt/yr — climate, not air quality
Who wanted it
Who asked for it
Meta — self-build
Who approved it
Joint Development Authority of Jasper, Morgan, Newton and Walton counties; Georgia Power supply under an IRP that has since added ~10 GW of forecast data center load
What it serves
Facebook, Instagram and WhatsApp serving; Llama inference
IT capacity
400 MW running of 600 MW announced
Neighbouring households on private wells reported sediment and dry taps during construction; New York Times reporting in 2025 tied the drawdown and site grading to the campus. Meta disputed causation but paid for replacement water systems.
Water and air figures are modelled from disclosed capacity, not measured — site-level
error is roughly ±40%. Diesel backup generators are not counted, so on-site figures are floors.
Full method.