Campus profile Operating

Inzai / Greater Tokyo cluster

Digital Realty · NTT · AirTrunk · Inzai, Chiba, Kantō, Japan

The resource footprint

Modelled average

In one day, this campus consumes about

9.0750-metre swimming pools

Filled with the volume of water consumed by the campus and its electricity supply.

The actual estimate5,987,162 US gallons consumed

50-metre pools · 2 metres deep
Each diagram = 1 pool. Partial shading shows the remainder.
At the campus2,179,280 galMaking its electricity3,807,882 gal

Power-plant water may come from a different watershed. This is a volume comparison, not a claim that households lose this water.

At current operating capacity · Annual model spread evenly over time, not a live meter. Site estimates may differ by roughly ±40%.

Comparison sizes & sources

One pool = 50 × 25 × 2 metres = 2.5 million litres (about 660,430 US gallons). Pool depths vary; this is a defined comparison size.

One home-year = 10,791 kWh, the EIA’s 2022 average US residential electricity purchases. This excludes electricity generated at home and is a fixed US benchmark for all sites.

One car-year = 4.6 tonnes CO₂, the EPA’s typical passenger vehicle tailpipe estimate. The campus model is in CO₂e; the comparison expresses approximate climate scale, not equal mixtures of pollutants.

Monthly values are annual totals ÷ 12; daily values are annual totals ÷ 365. Actual demand varies. Comparisons cover the whole campus, including non-AI uses.

Water: see the numbers and sources

This is water used up, mainly through evaporation. Power-generation water may be used in a different watershed.

Total water use2,185M gal/yr
Evaporated on site795M gal
Making the power1,390M gal
Household comparison27,316homes, at 80,000 gal/year
Pressure on local water
Medium-High — a regional measure of demand compared with available water
Where the water comes from
Municipal potable supply
Cooling
Chilled water with evaporative towers; humid summers limit free cooling
Basis
Modelled from cooling design — WUE 0.74 L/kWh
Air: see the numbers and sources

The totals include nitrogen oxides, sulphur dioxide and fine particles. They cover both this site and the power plants supplying it.

Nitrogen oxides648t/yr
Sulphur dioxide567t/yr
Fine particulates80.9t PM2.5
Health (EPA)$72.8M/yr
Health range
$25.4–72.8 million a year. Lower bound is EASIUR national mid-range; upper is EPA benefit-per-ton at a ~$12M VSL.
Statistical deaths
6.07 a year at that VSL — a national-average conversion from tons, not a local concentration study.
Equals
809,424 cars of NOx
Where it burns
Japan — TEPCO area
Generation mix
Gas 44 · Coal 28 · Solar 11 · Nuclear 6
Diesel backup
Diesel backup is not yet counted for this campus, so on-site air figures are a floor.
CO₂e
1,785 kt/yr — climate, not air quality
The project, approvals and community concerns
Who asked for it
Japanese enterprises and government, plus AWS, Microsoft and Google regions and SoftBank's AI buildout
Who approved it
Chiba prefecture and Inzai city; TEPCO supply — Japan's post-Fukushima gas-and-coal mix keeps carbon intensity high
What it serves
Japanese cloud regions, financial exchanges, and sovereign AI programmes
IT capacity
600 MW current capacity / 1,100 MW full-build scenario

Japan's compute is concentrated on a seismic zone near Tokyo for latency reasons, on a grid that is still carbon-heavy because most reactors remain offline. Both AWS and Microsoft announced multi-billion expansions here in 2024–25.

coal-heavy grid

Keep this guide handy

35.8320°, 140.1450°

Quote or share these estimates

Gigawatt Ledger (2026). Inzai / Greater Tokyo cluster: water and air. https://gigawatt-ledger.pages.dev/site/tokyo/. Modelled from disclosed capacity; site-level error ±40%.

Include the estimate’s date, whether it describes current or proposed capacity, and its uncertainty. Get an embeddable card.

Gigawatt Ledger · September 2026. Water and air figures are estimated from public records and disclosed capacity. How we calculate them · Use this in your community.