Ulanqab hub

Alibaba Cloud · Ulanqab, Inner Mongolia, China

Water — consumed, not returned

Taken from the basin1,592M gal/yr
Evaporated on site337M gal
Making the power1,255M gal
Basin stressHigh
Where the water comes from
Municipal potable supply
Cooling
Free cooling most of the year on the Mongolian plateau
Basis
Modelled from cooling design — WUE 0.50 L/kWh

Air — what the stacks emit

Nitrogen oxides1,336t/yr
Sulphur dioxide1,130t/yr
Fine particulates193t PM2.5
Health damages$159M/yr
Where it burns
China — Inner Mongolia
Generation mix
Coal 66 · Wind 21 · Solar 9
CO₂e
1,503 kt/yr — climate, not air quality

Who wanted it

Who asked for it
Alibaba — self-build, plus Chinese state and enterprise customers
Who approved it
Designated a national hub under the 'East Data, West Computing' plan; NDRC sets a PUE cap of 1.25 for new national-hub builds
What it serves
Alibaba Cloud north China region and Qwen model training
IT capacity
300 MW running of 700 MW announced

China's policy deliberately moves compute to the cold, windy north — which cuts cooling energy but places it on one of the most coal-heavy grids on the planet. The carbon per unit of compute here is roughly four times Finland's.

coal-heavy gridwater-stressed basin

Where it is

41.0200°, 113.1300°

Water and air figures are modelled from disclosed capacity, not measured — site-level error is roughly ±40%. Diesel backup generators are not counted, so on-site figures are floors. Full method.